Tipper - The Critical Path download free
| Genre: |
Electronic |
| Performer: |
Tipper |
| Title: |
The Critical Path |
| Style: |
Breakbeat, Abstract, IDM, Experimental |
| Date of release: |
2000 |
| Country: |
UK |
| MP3 album size: |
1872 mb |
| FLAC APE album size: |
1606 mb |
| WMA album size: |
1599 mb |
| Digital formats: |
ADX VOC VQF AAC MMF FLAC MPC |
Tracklist Hide Credits
| 1 |
Seldom Vile |
5:12
|
| 2 |
Twister |
4:49
|
| 3 |
L.E.D Down |
4:39
|
| 4 |
Dissolve (In) |
5:18
|
| 5 |
Dissolve (Out)Vocals – Deborah Anderson |
4:08
|
| 6 |
Supersport |
3:43
|
| 7 |
Sort Code |
5:51
|
| 8 |
Cable To Continue |
4:56
|
| 9 |
Night Vision |
5:46
|
| 10 |
Last Informer |
5:15
|
| 11a |
On Condition (The Condition) |
6:53
|
| 11b |
Untitled |
5:30
|
Credits
-
Arranged By
–
Noel Vine (tracks: 3, 8, 10, 11),
Tipper (tracks: 3, 4, 8, 10, 11)
-
Artwork [Airbrush Art]
–
Adrian Chestermann*
-
Design
–
The Designers Republic
-
Lyrics By
–
Tipper (tracks: 3, 5, 8, 10)
-
Producer, Written-By
–
Tipper
-
Strings
–
City String Orchestra (tracks: 3, 4, 8, 10, 11)
-
Vocals
–
Sophie Barker (tracks: 3, 8, 10)
Notes
Cardboard sleeve.
Track 11a is followed by silence for 1:00 minute, then 5:30 minutes of bass experiments as track 11b.
Other versions
| Category |
Artist |
Title (Format) |
Label |
Category |
Country |
Year |
| HIGH9CD, 4946852000 |
Tipper |
The Critical Path (CD, Album)
|
Higher Ground, Higher Ground |
HIGH9CD, 4946852000 |
UK |
2000 |
| HIGH9LP, 4946851000 |
Tipper |
The Critical Path (2xLP, Album)
|
Higher Ground, Higher Ground |
HIGH9LP, 4946851000 |
UK |
2000 |